Home / Media / Industry News / Classification and installation methods of shower heads

Classification and installation methods of shower heads

There are three types of shower heads:
1. Portable shower: You can hold the shower in your hand to shower at will, and the shower bracket has a fixed function.
2. Rain shower: The shower head is fixed at the top of the head, the bracket is inserted into the wall and does not have the lifting function, but there is a small movable ball on the shower head, which is used to adjust the angle of the water outlet, and the up and down movement angle is more flexible.
3. Lifting shower: similar to the rain shower, but with more lifting function, users can lift according to their height for convenient use.
4. In-wall shower: The shower is hidden in the wall and sprays sideways on the body. There are various installation positions and water spray angles, which play the role of cleaning and massaging.
Shower installation method:
1. The overhead shower of the exposed lift rod is generally defined by the water surface of the shower, and the recommended distance is 2 meters. The buried water pipe of the exposed shower switch is hot on the left and cold on the right, and the center distance should be 150cm. The buried water outlet on the wall should be level with the tile surface, and the internal buried water pipe should be perpendicular to the wall. After the shower is installed, it should be wall is at a 90-degree angle.
2. For concealed showers, the distance between the center of the buried water outlet on the wall and the ground should be 2.1 meters, and the recommended distance between the center of the shower switch and the ground is 1.1 meters. This is the standard height, but during the actual installation of the shower, it should be based on the use of The height of the person is adjusted accordingly.
After you buy a shower, bathtub, and wall faucet, you can choose the appropriate height to bury the water pipe. The distance between the hot and cold water pipes must reach 15 cm. Before installation, you must not forget to flush the water pipe, so as to avoid damage to the faucet caused by excessive water quality.
Concealed shower and bathtub faucets: After purchasing a concealed faucet, the valve core of the faucet should be pre-buried in the wall. Be sure to pay attention to the thickness of the bathroom wall before pre-embedding. If the wall is too thin, the valve core will not be able to be embedded. Do not remove the plastic protective cover of the valve core during pre-embedding, so as not to damage the valve core by cement and other chores during pre-embedding. In addition, when pre-embedding the valve core, you should also pay attention to the up and down, left and right directions of the valve core, so as to avoid the wrong valve core. If the size of the wall-mounted faucet has deviated when the water inlet pipe is pre-buried, an adjustable crutch can be used to calibrate the position.

  Square shower head complete system rainfall faucet F9644